Grid connection
with no dead ends
Nobody can tell in advance whether the grid has free capacity – the grid operator decides only in its statement on the application and allocates capacity in the order of complete applications. So we prepare the application to pass the first time and file it as early as possible.
From the site check to the connection contract
For generation and consumption, with EG.D, ČEZ Distribuce and PREdistribuce.
Four steps to the contract
Capacity is allocated by the date of the complete application – your place in the queue is what matters most.
Four things that cost time
What people ask us
Can I apply for a connection before I have a design?
Yes, and that is the right order. The application needs only a site plan, a basic diagram and technology data; the detailed design follows the grid operator's conditions.
How long does connecting a battery storage system take?
The grid operator's statement alone has a deadline set by the connection decree (roughly 30–60 days). The whole path from application through design, permits and construction to commissioning is much longer – for a storage system usually a year or more, depending on the capacity, the site and whether the grid operator has to reinforce the grid. That is why we file the application right at the start.
What if the grid operator refuses the connection or reduces the capacity?
We propose a change to the plan: lower capacity, limited export to the grid, a different connection point or a medium-voltage connection. Most refusals can be resolved.
Do you handle connections for installers too?
Yes. We prepare applications and documentation for installers' contracts, so they can focus on the installation.
Check your site
Cadastral area, plot numbers and the required capacity. We will get back within 48 hours.