BESS DESIGN

Battery
storage

Energy stored exactly where it's needed. Storage for businesses, agricultural sites and the utility scale – including grid connection.

240+ MWhof storage in our projects
LV & MVconnection and transformation
Study → as-builtall documentation stages
Battery storage illustration
WHAT WE DESIGN

The whole storage system in one set of documents

Equipment, grid connection and civil works. Each part builds on the next.

01 Study Where the storage can stand and how it connects. Options and payback.
02 Equipment layout Layout of battery containers, inverters and transformers on site.
03 3D visualisation The storage system in 3D before it is built – for the investor and the authorities.
04 Equipment foundations Foundation drawing and documents for the foundations.
05 MV connection Transformer stations, MV switching stations and transformation.
06 Cable routes LV and MV cables on site and to the point of connection.
07 Diagrams and switchboards Single-line diagrams, switchboards and metering.
08 Lightning protection Risk management, air-termination system and earthing.
09 Surge protection Protection of equipment on the LV and MV side.
10 Calculations Cable sizing, voltage drops and short-circuit conditions.
DOCUMENTATION STAGES

From study to as-built

We prepare one stage, or all of them in sequence.

01 Study Where the storage can stand and how it connects.
02 Permit design Documentation for the building permit.
03 Detail design Detail design for construction.
04 As-built As-built documentation.
PERMITTING Authority statementsGrid connection applicationFiling via the Builder's Portal
HOW LONG IT TAKES
Site check
3 days
Study
2–3 weeks
Permit design
4–6 weeks
Detail design
6–8 weeks
02468101214
weeks
!Need it sooner? Get in touch as early as possible – we'll gladly prioritise your deadline. The exact date is always in our quote.
PROJECTS

Selected
storage projects

240+MWh
storage capacity we have designed or are designing now
Battery storageapproximate location
BATTERY STORAGE Přerov
Permit designDetail designMV connection upgrade
6MW
power
15MWh
capacity
BATTERY STORAGE Kralice na Hané
Permit designDetail designMV connection optionsSwitching station
5MW
power
10MWh
capacity
BATTERY STORAGE Ostrava-Přívoz
Permit designDetail designMV switching stationLightning protectionMV surge protection
1.8MW
power
7.5MWh
capacity
BESS
Beroun
4MW
power
6MWh
capacity
StudyPermit designGrid connection
BESS
Šakviceagricultural site
450kW
power
1.8MWh
capacity
Permit designTwo building structures
BESS
Horní Bojanoviceagricultural site
391kW
power
1.6MWh
capacity
Permit designTransformer stationsLightning protectionGrid connection
WHY NOT WAIT

Grid capacity is allocated in order of applications

Whoever has the documentation and application ready first is in a better position. Every month of delay can mean worse connection terms.

Order of applicationsThe grid operator assesses connection applications one by one, based on free grid capacity.
Subsidy deadlinesSubsidy calls have fixed deadlines – the documentation must be ready before them.
Site check within 3 daysIn three working days you know whether it makes sense to go on.
SITE CHECK

Can you build on the site?

Send us the plot numbers and the required power. Within 3 working days of confirming the details, you know what stands in the project's way. If you then commission the project, we deduct the cost of the check from the project price.

Zoning plan
Nature protection – protected landscape areas and Natura 2000
Agricultural land protection
Flood zones
Protection zones and utilities
Indicative grid connection options
What we need from you
Cadastral area and plot numbers
Required power or capacity
Purpose – power plant, storage, or both
TO GET STARTED

A few details are enough

Site – cadastral area and plots
Required power and capacity
Purpose – self-consumption, energy trading, ancillary services
Existing site connection, if the storage sits behind the meter
Selected technology, if you already have it
Grid operator's statement, if you already have one
Send what you have We'll complete the rest together. We'll be in touch.
Have solar PV? We'll design storage for it.
Solar PV→
NO RISK

No surprises

A project is a big investment. That's why we share the risk with you.

Site check deducted If you commission the project, we deduct the cost of the site check.
Fixed price and deadline The price and deadline in our quote hold – unless the scope of the project changes significantly.
Revisions included We incorporate comments from the grid operator and authorities at no extra charge.
We adapt to you We set the scope, schedule and approach to suit your needs.
NO MIDDLEMEN You talk directly to the designer No sales reps, no call centre. You speak to the people who design and draw your project.
Michal Fridrich+420 721 326 230
Denis Bravenec+420 702 663 226
CONTACT

Let's start with your storage

Three details are enough. We'll sort out the rest by phone – we'll get back to you within 48 hours.

REGISTERED OFFICEVILMONT Holding s.r.o.
Nové sady 988/2, 602 00 Brno
BRANCH OFFICESvatoplukova 654
698 01 Veselí nad Moravou
COMPANY ID / VAT ID14250217 · CZ14250217
1Basics2Details (optional)
Project type

We'll call you within 48 hours. You can add power, documentation stage and documents in the next step. We process your data only to handle the enquiry. How we handle your data
1We call you within 48 hoursThe designer in person, no call centre.
2We refine the scopeWhat you have, what's missing, whether a site check makes sense.
3Quote with price and deadlineIn writing, so you can compare.
1Basics2Details (optional)
Thanks, your enquiry has arrivedWe've sent you a confirmation by e-mail. Want to tell us more? It will save one phone call.
Documentation stage
Documents (optional)